IB Physics Work Done and Kinetic Energy
/A tutorial sheet on the Topic A concepts of work done and kinetic energy.
A block of mass 2.0 kg is at rest on the ground. A constant upwards force X of 30.0 N acts on the block for 5.0 s.
- Find the net force acting on the block.
- Find the work done by the net force during the 5.0 s.
- Find the kinetic energy of the block after 5.0 s.
- Find the work done by the force X during the 5.0 s.
A block of mass M is at rest on the ground. A constant upwards force F acts on the block for a time t.
- Show that the kinetic energy of the block after a time t is 1/(2M) (F-Mg)2t2.
- Show that the gain in gravitational potential energy of the block is g/2(F-Mg)t2.
- Show that the work done by the force F is F/(2M)(F-Mg)t2.