IB Physics Work Done and Kinetic Energy

A tutorial sheet on the Topic A concepts of work done and kinetic energy.

A block of mass 2.0 kg is at rest on the ground. A constant upwards force X of 30.0 N acts on the block for 5.0 s.

  1. Find the net force acting on the block.
  2. Find the work done by the net force during the 5.0 s.
  3. Find the kinetic energy of the block after 5.0 s.
  4. Find the work done by the force X during the 5.0 s.

A block of mass M is at rest on the ground. A constant upwards force F acts on the block for a time t.

  1. Show that the kinetic energy of the block after a time t is 1/(2M) (F-Mg)2t2.
  2. Show that the gain in gravitational potential energy of the block is g/2(F-Mg)t2.
  3. Show that the work done by the force F is F/(2M)(F-Mg)t2.